In urban development, it is essential to ensure that any building construction adheres to the regulations set by the Airport Authority of India (AAI), particularly regarding building height clearance. Buildings near airports must comply with height restrictions to maintain air traffic safety. The AAI provides a clear process for developers and individuals seeking a No Objection Certificate (NOC) for their building’s height clearance.

What is the NOC from AAI?

The No Objection Certificate (NOC) from AAI is a mandatory document required for any construction project near an airport. This ensures that the proposed building or structure does not pose a risk to flight paths or aircraft operations. Without this clearance, the project may face legal challenges or even be halted.

Why is Building Height Clearance Necessary?

The clearance is primarily to maintain airspace safety. Since airports deal with constant aircraft movement, tall buildings, communication towers, or other structures could interfere with the safety of flights. The building height clearance guidelines are based on factors like the distance of the building from the runway and the elevation of the land.

Steps to Obtain a NOC for Building Height from AAI

  1. Check Eligibility: If your construction site is within a certain radius of an airport, typically within 20 km, you must apply for a building height clearance NOC.
  2. Submit Online Application: The application process for obtaining an NOC from AAI is entirely online through the AAI’s dedicated portal. The applicant must provide details such as:
    • Site location (latitude and longitude)
    • Proposed height of the building or structure
    • Distance from the nearest airport
  3. Review and Scrutiny by AAI: Once the application is submitted, the AAI reviews the proposal. They check the location’s proximity to the airport and analyze whether the height of the building could interfere with the flight operations.
  4. Issuance of NOC: If the building height is within permissible limits, AAI grants the NOC. If the height exceeds the limit, you may need to modify the building plan or adjust the height accordingly.
  5. Post-NOC Compliance: After receiving the NOC from AAI, the builder must comply with the terms specified in the clearance document. This includes sticking to the approved height and notifying the authorities about any changes to the construction plan.

Key Points to Remember:

  • The building height clearance guidelines depend on the distance from the airport and the height of the land.
  • Construction projects within a specified radius must mandatorily secure the NOC before starting the construction.
  • The process of securing the NOC can take some time, so it’s recommended to apply well in advance of starting the project.

Consequences of Non-Compliance

Failure to obtain an NOC for building height from AAI can result in severe consequences. Your project might be stalled, and there could be legal penalties. Moreover, non-compliance poses serious safety risks for aircraft and passengers.

Conclusion

Obtaining the No Objection Certificate (NOC) from the Airport Authority of India (AAI) is a critical step for any construction near airports. Developers must ensure that their project complies with the AAI’s building height clearance norms to avoid any hindrances and maintain air safety. The online application process makes it easier for developers to secure this important clearance document.

If you’re planning a project near an airport, make sure to check the guidelines and apply for the NOC well in advance.

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *